Energy and Water Appropriations Requests:
by Pacific NW Waterways Association |
Columbia Snake River System Inland Navigation
Barging on the Columbia Snake River system carries 10-12 million tons of cargo worth $1.5-2 billion annually. Barging feeds 50% of the wheat exports and 25% of the containers handled at the Lower Columbia ports.
Note: The Portland and Walla Walla Districts have collaborated to produce a long-term major maintenance plan for the inland navigation projects on the Columbia Snake River System. This planned work will take place from FY2010 to FY2017. The increased needs reflected in PNWA's FY2010 requests correspond to the critical nature of this work. If the Corps is not provided funding in a timely manner, lock outages and system unavailability could increase, affecting the economic well-being of farmers, shippers, ports and those who rely on the river system.
Operations & Maintenance | FY2010 President's Budget |
Support Additional Funds | PNWA FY2010 Request |
House bill (H.R. 3183) |
Senate bill (S. 1436) |
Conference Report (111-278) |
---|---|---|---|---|---|---|
Bonneville Lock & Dam Repair: navlock seepage nav crane boom |
13,911,000 | 475,000 220,000 |
14,606,000 | 13,911,000 | 13,911,000 | 13,220,000 |
The Dalles Lock & Dam Navlock controls repair |
8,769,000 | 1,400,000 |
10,169,000 | 8,769,000 | 8,769,000 | 8,333,000 |
John Day Lock & Dam Repair downstream navlock guide wall |
8,901,000 | 750,000 |
9,651,000 | 8,901,000 | 8,901,000 | 8,459,000 |
McNary Lock & Dam Replace Upstream miter gate pins waterstop repair major maint. plans & specs |
7,137,000 | 1,300,000 200,000 1,320,000 |
9,957,000 | 7,137,000 | 7,137,000 | 6,783,000 |
Ice Harbor Lock & Dam PSMP Upstream taunter gate repairs Upstream anchor gate rehab Hard Rock moorage cells |
5,828,000 | 257,000 680,000 525,000 2,900,000 |
10,190,000 | 5,828,000 | 5,828,000 | 5,539,000 |
Lower Monumental Lock & Dam Major maintenance |
2,735,000 | 4,000,000 |
6,735,000 | 2,735,000 | 6,735,000 | 2,599,000 |
Little Goose Lock & Dam Miter gate hydraulic system rehab casting for pintie heel assembly Downstream gate repair |
2,511,000 | 300,000 650,000 8,400,000 |
11,901,000 | 2,551,000 | 2,551,000 | 2,424,000 |
Lower Granite Lock & Dam Concrete & armor repair Major maintenance report |
7,651,000 | 155,000 510,000 |
8,316,000 | 7,651,000 | 7,651,000 | 7,278,000 |