Energy and Water Appropriations Requests:
Columbia Snake River System Inland Navigation

by Pacific NW Waterways Association
PNWA.net, Fiscal Year 2010

Columbia Snake River System Inland Navigation

Barging on the Columbia Snake River system carries 10-12 million tons of cargo worth $1.5-2 billion annually. Barging feeds 50% of the wheat exports and 25% of the containers handled at the Lower Columbia ports.

Note: The Portland and Walla Walla Districts have collaborated to produce a long-term major maintenance plan for the inland navigation projects on the Columbia Snake River System. This planned work will take place from FY2010 to FY2017. The increased needs reflected in PNWA's FY2010 requests correspond to the critical nature of this work. If the Corps is not provided funding in a timely manner, lock outages and system unavailability could increase, affecting the economic well-being of farmers, shippers, ports and those who rely on the river system.

Operations & Maintenance FY2010
President's Budget
Support Additional Funds PNWA
FY2010 Request
House bill
(H.R. 3183)
Senate bill
(S. 1436)
Conference Report
(111-278)
Bonneville Lock & Dam
Repair: navlock seepage
nav crane boom
13,911,000  
475,000
220,000
14,606,000 13,911,000 13,911,000 13,220,000
The Dalles Lock & Dam
Navlock controls repair
8,769,000  
1,400,000
10,169,000 8,769,000 8,769,000 8,333,000
John Day Lock & Dam
Repair downstream navlock guide wall
8,901,000  
750,000
9,651,000 8,901,000 8,901,000 8,459,000
McNary Lock & Dam
Replace Upstream miter gate pins
waterstop repair
major maint. plans & specs
7,137,000  
1,300,000
200,000
1,320,000
9,957,000 7,137,000 7,137,000 6,783,000
Ice Harbor Lock & Dam
PSMP
Upstream taunter gate repairs
Upstream anchor gate rehab
Hard Rock moorage cells
5,828,000  
257,000
680,000
525,000
2,900,000
10,190,000 5,828,000 5,828,000 5,539,000
Lower Monumental Lock & Dam
Major maintenance
2,735,000  
4,000,000
6,735,000 2,735,000 6,735,000 2,599,000
Little Goose Lock & Dam
Miter gate hydraulic system rehab
casting for pintie heel assembly
Downstream gate repair
2,511,000  
300,000
650,000
8,400,000
11,901,000 2,551,000 2,551,000 2,424,000
Lower Granite Lock & Dam
Concrete & armor repair
Major maintenance report
7,651,000  
155,000
510,000
8,316,000 7,651,000 7,651,000 7,278,000


Pacific NW Waterways Association
Energy and Water Appropriations Requests: Columbia Snake River System Inland Navigation
PNWA.net, Fiscal Year 2010