the film forum library tutorial contact |
Thompson Metal Ships Parts for Snake River Dam
by StaffThe Columbian, November 9, 2010 |
Conference to focus on several issues that will affect water supplies for eastside
Vancouver-based Thompson Metal Fab Inc. prepared this week to ship out an $8 million, 750-ton gate system the company built to replace the locks at the Lower Monumental Dam on the Snake River near Walla Walla.
The equipment will make a 254-mile trip up the Columbia River and the Snake, a Columbia tributary. The new gate is being shipped as three 250-ton fabricated sections that will be welded together on site to construct the new gate, a replacement for the dam's aging gate.
The new gate is part of a larger effort by the U.S. Army Corps of Engineers to improve infrastructure for river traffic and fish passage on the Columbia-Snake system.
learn more on topics covered in the film
see the video
read the script
learn the songs
discussion forum